Integrated water solutions across East Africa

Our process

A disciplined route from first survey to final handover.

Clear phases, defined outputs and site-specific decisions make delivery more predictable.

Site assessment & survey

We confirm demand, access, geology and the preferred drilling location.

1–3 days

Drilling & development

We drill, install casing and screens, then purge and develop the borehole.

3–7 days

Pump installation & testing

We size and install the pumping system, controls and safety components.

2–4 days

Water quality analysis

We sample, analyse and document the quality of the developed water source.

3–5 days

Handover & documentation

We commission the full asset, explain its operation and issue documentation.

1–2 days

Designed around evidence

Every technical choice is linked to site conditions and required performance.

Depth, yield, total dynamic head, daily water demand and water quality all influence the final system.

  • Geology guides the drilling and casing approach
  • Test results guide pump and power selection
  • Daily demand guides storage and distribution
  • Water quality results guide any treatment recommendation
Hydrosphere Africa team at a borehole development site

Key deliverables

What you receive at handover.

Commissioned water asset

A complete, tested and operational system built to the approved project scope.

Water quality reporting

Clear laboratory analysis and practical interpretation of the results.

Technical documentation

Project records, equipment information and system details for future reference.

Operational orientation

Guidance on safe operation, system controls and routine care.