Integrated water solutions across East Africa

Our services

End-to-end water systems, engineered as one.

Surveys, borehole development, pumping, storage, irrigation and water quality reporting—coordinated from one accountable team.

01

Hydrogeological surveys

Initial assessment of subsurface conditions to identify viable water sources, define an optimal borehole location and frame depth and yield expectations.

  • Site reconnaissance and geophysical assessment
  • Recommended drilling position
  • Depth and aquifer interpretation
  • Technical survey reporting

02

Borehole drilling & development

Rotary drilling with site-appropriate fluids, food-grade uPVC or stainless-steel casing and screens, hydraulic development and test pumping.

  • Typical depth: 50–150 metres, site-specific
  • Standard 6-inch borehole diameter
  • Purging, airlifting and yield testing
  • Wellhead safety and final documentation

03

Solar pumping systems

Pump and power systems selected from required flow rate, total dynamic head and tested yield—designed for reliable off-grid operation.

  • Submersible pump selection
  • Solar array and electrical controls
  • Dry-run and surge protection
  • Commissioning and operator guidance

04

Water storage infrastructure

Storage and distribution systems sized around daily water demand, pumping cycles and the pressure required at the point of use.

  • Polyethylene and steel storage options
  • Tank bases and elevated structures
  • HDPE or galvanised pipework
  • Fittings, controls and distribution

05

Climate-smart irrigation

Efficient irrigation and water delivery designed to support continuous production, stronger crop quality and lower climate exposure.

  • Demand and crop-area assessment
  • Pressure and flow planning
  • Storage-to-field distribution
  • Solar-friendly pumping cycles

06

Water quality & handover

Comprehensive water analysis through an accredited laboratory, followed by clear reporting, system commissioning and documented handover.

  • Representative sampling
  • Laboratory quality analysis
  • Commissioning checks
  • Final reports and asset documentation

Planning guide

Indicative benchmark cost ranges.

These standardised benchmarks are a starting point for planning. Every project receives a tailored Bill of Quantities after site assessment.

ItemTypical scopeUnitBenchmark cost (KES)
Borehole drillingSurvey-informed drilling and casingLinear metre8,000–15,000
Development & purgingHydraulic development and airliftingPer borehole40,000–70,000
Submersible pump5.5kW, 4-inch, tailored to depthPer unit120,000–250,000
Ancillary pump equipmentControl panel, cables and safety ropePer borehole30,000–60,000
Water quality testingComprehensive accredited-lab analysisPer test10,000–20,000
Storage tank (5,000L)Polyethylene tank and base structurePer unit50,000–80,000
Pipework & fittingsPump-to-tank connection and distributionPer project25,000–50,000
Project managementSite visits, coordination and reportingPer project75,000–150,000

Important: Final pricing depends on geology, depth, location, access, yield requirements and the selected system configuration.

Built for your site

Start with the right assessment.

Tell us your location, intended use and water demand. We will recommend the appropriate survey and project path.